Teppermans Furniture - Warehouse Addition (London)
Description:
General Contractor: Fortis Groupâ£
Project Manager: Marcus Poynter⣠/ Brad Laforet
Project Supervisor: Pashk Duhanaj / Andrew Csoliâ£
â£
Another joint venture project between Rauth Sheet Metal Limited and Rauth Roofing Limited.â£
â£
The scope of work included a new 70,000 square ft. 60mm Mechanically Fastened Carlisle Syntec TPO roof system and 36,000 square ft. 24gauge, Vicwest, exposed fastener CL-2026 Siding.â£
â£
In addition to the exterior building shell Rauth Sheet Metal was also the selected contractor for all the interior siding wall systems and custom sheet metal column flashings throughout the facility. Approximately (38) custom pieces were required to complete the loading bay alone.â£
â£
Construction: Vicwest CL-6025 with R-35 pre-laminated insulation.
Size: 36,000 SF